Studies & Surveys
As part of the Heritage Lottery Fund Stage 2 application a number of linked studies and plans have been produced. These include:
BW Droitwich Junction and Barge Canals Restoration Flood Risk Assessment
- BW Droitwich Junction and Barge Canals Restoration Flood Risk Assessment Jan 06 (2.1MB PDF) Appendices
- Appendix 1 (197KB PDF)
- Appendix 2 (46KB PDF)
- Appendix 3 (74KB PDF)
- Appendix 4a (473KB PDF)
- Appendix 4b (593KB PDF)
- Appendix 4c (505KB PDF)
- Appendix 4d (443KB PDF)
- Appendix 5-1 (1.1MB PDF)
- Appendix 5-2 (1MB PDF)
- Appendix 6 (1.6MB PDF)
- Appendix 7 (15.9B PDF)
Detailed Engineering studies

