Restoration Update 2008
November 2008
The first dredgers arrive onsite.
View through the new Armco culvert directly in front of the Droitwich Rugby Club.
October 2008
Receiving a cheque from Waitrose for donation to the project. .
N Power Volunteers working on the restoration of a spill weir.
During October over 400 supporters school children and members of the local community visited the main Junction Canal Construction site.
September 2008
Looking towards the M5 with the new pedestrian bridge in place.
Lock 6 Construction, Junction Canal.
Foundation for the new Rugby Club Access bridge.
June 2008
Creation of Lock 4 and 5 on the Junction Canal, concrete base being installed.
Volunteers shaping stones for the new double lock.
Reptile and amphibian trapping underway around Hanbury area.
You may need to install the Adobe Acrobat Reader software in order to view and print these file
Downloads
Restoration Droitwich Barge & Junction Canals Proposals
Maps
Index Map (541KB PDF)
Map 01 (750KB PDF)
Map 02 (786KB PDF)
Map 03 (490KB PDF)
Map 04 (476KB PDF)
Map 05 (417KB PDF)
Map 06 (831KB PDF)
Map 07 (708KB PDF)
Map 08 (758KB PDF)
Map 09 (783KB PDF)
Map 10 (762KB PDF)
Map 11 (889KB PDF)
Map 12 (571KB PDF)
Map 13 (500KB PDF)
Drawings
Drawing 1 (339KB PDF)
Drawing 2 (1.8MB PDF)
Drawing 3 (806KB PDF)
Drawing 4 (513KB PDF)
Drawing 5 (403KB PDF)
Drawing6 & 7 (415KB PDF)
Drawing 8 (306KB PDF)
Drawing 9 (517KB PDF)
Drawing 10 (328KB PDF)
Drawing 11 (587KB PDF)
Drawing 12 (1.2MB PDF)
Drawing 13 (580KB PDF)
Drawing 14 (636KB PDF)
Drawing 15 (725KB PDF)
Drawing 16 (365KB PDF)
Drawing 17 (1.2MB PDF)
Drawing 18 (244KB PDF)
Drawing 19 (164KB PDF)

