Liverpool Canal Link Home
On this site you will find in-depth information about British Waterways £20m flagship restoration project.
The extension to the Leeds & Liverpool Canal is along the historic Liverpool waterfront, utilising and upgrading the existing dock basins and creating new sections of canal channel as required.
The canal link will be completed in December 2008 with the Pier Head section finished earlier in September. After a period of testing and commissioning the canal link will be open to boats in Spring 2009 and British Waterways will update this website with information about navigation when it becomes available.


